Let There Be Lights!

4/28/2022

0 Comments

 
While we’ve made some invisible progress on the electrical system over the past few weeks, the only visible progress is that all the external lights are hooked up, AND they work!  So, we are now really visible!
Picture
Picture
Picture
0 Comments

Lots Done, But Little To See

4/3/2022

0 Comments

 
We’ve made a lot of progress over the past couple of weeks, but it isn’t super visible.  The floor is done, like done-done.  The electrical system is creeping towards finished, and when that’s in, we’ll finish the plumbing and put in the gas lines.  Getting outlets put in the bedroom will also mean we’ll be done working up there, so we can then see if we need any modifications on our plan for the bed.  When that’s all done, we’ll probably get a few more things done at Koops’ including racks and some sort of storage systems for the bathroom and the garage.  Then, shrinkwrap, and then…we’ll be ready to get on the road.
Picture
Last week, Jon from Sunselectric spent a whole day getting the wiring almost done. It still needs to be connected to the batteries, and Tom wants Jon’s blessing before the final hookup, but then we’ll be ready to park in the sun and charge from the solar panels.
Picture
Tom spent yesterday doing lots of things, and one of them was putting the cabinet back together.
Picture
Tom also built a shelf over the batteries for the shore power charger, one of the DC circuit boxes, and other miscellaneous things. Don’t worry, before he did this get got on line and double checked his research to make sure it was really okay to have lithium iron batteries in a closed box with flammable material. It is.
Picture
Tom also connected the battery monitor. I have no idea what the numbers mean, but they change frequently and it looks significant.
Picture
Wires have been run from the electrical system through the water box and around the corner so they can run along the wall where the refrigerator and washer will be plugged in. We’ll also have a couple of AC outlets on that line, as well as DC for the ceiling vent fans and toilet fan. Note the new pump ready to be installed as well.
Picture
The floor is done! Tom oiled it with boiled linseed oil, and then installed the molding to hold it down. Since it will be on a moving platform, it’s designed to float with the moldings at both ends of the boards holding it down.
Picture
View of the floor from the door.
0 Comments

    Meet the Moonracers

    Tom and Marge are taking Moonracer Farm On The Road Again.  Follow our journey to build an expedition vehicle and travel!


    Overnight Stops

    Archives

    January 2024
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    November 2019

    Categories

    All

Web Hosting by Netfirms