Yesterday was really exciting. We had visited the camper on Tuesday, and weren’t overly impressed with the progress. So, we went back yesterday, Friday afternoon, and we were amazed at how much was done in three days. The taillights are on, the back door latch is on, most of the interior walls are up, and windows are installed. Things are in place for the bathroom to be done early next week, and then they’re moving on to “accessories,” which is basically everything we are having installed in the shell: appliances, cabinets, water tank and utility boxes, etc.
This is the screen part of the door, shut. Justin had sent us a photo of the door installed, but this is the first time we had seen it in person. The open space to the right of the door is going to be a closet, which will extend into the motorcycle garage over the wheels of the motos.